01
What to send before an estimate
Drawings, the building type, and the date you need a figure are enough to start.
Read moreShow less
Send the latest drawings, a line on what the building is, and the date you need a figure. Say whether the figure is for a budget, a conversation with a lender, or a check of a contractor's number. A plot address in Bareilly, or elsewhere in Uttar Pradesh, helps when the question depends on the site.
An early figure is coarser than a full measure. The note that comes back should say which drawings were used and what was not drawn: external works, services, or a floor that is still a sketch.
Hi Tech Consultant does not turn a missing drawing into a precise rate. If the pack is too thin for the question you asked, the reply says so and names the sheet that would change the figure.